• : +65 6795 4666
  • : +65 6795 4222
  • : general@onengineers.com
  • Home
  • About Us
    • Management Team
    • Our People
    • Our Clients
    • Commendations
    • Join Us
    • Contact Us
    • Privacy Statement
  • Services
    • Electrical Licensing
    • Technical Training
    • Shutdown Maintenance
    • Condition Monitoring
    • Consultancy & Project Management
    • Energy Management
    • Power Quality & Analysis
    • Electrical System Study and Design
    • M&E Design & Consultancy
    • M&E Professional Engineer Services
  • News & Events
  • Articles
  • PD Case Study
  • LEW Course
  • Videos

Faults at cable termination

ON Engineers > Videos > Faults at cable termination

Faults at cable termination


Oct 27, 2020

FAULTS AT CABLE TERMINATION

  • Part 1 – The various layers of a screened type Power Cable
  • Part 2 – Heat shrink type cable termination
  • Part 3 – Case studies
  • Part 4 – Use of online Partial Discharge measurement to detect defects at cable termination.

BY
LEE WAI MENG
ELECTRICAL PE/LEW (230KV GRADE)

  • Share This Post :
Previous Post
Re-install front panel of GIS
Next Post
The cost of asset replacement – When is the best time to invest

Recent Posts


  • The Cost of Asset Replacement: When is the Best Time to Invest? | Schneider Electric
  • The Modern Approach to Maintaining Your Electrical Assets | Schneider Electric
  • The modern approach to maintaining your electrical assets
  • The cost of asset replacement – When is the best time to invest
  • Finding Fault in electrical installation

Recent Posts


The use of multiple sensors, of electrical and non-electrical type, for online PD measurement of cables, transformers, switchgears and motors

Aug 21, 2020

Our Guys At The TCS Amsterdam Marathon 2019!

Oct 25, 2019

Cable termination to GIS

Oct 1, 2020

Working Time


  • Monday 08:15 am - 05:30 pm
  • tuesday 08:15 am - 05:30 pm
  • wednesday 08:15 am - 05:30 pm
  • thursday 08:15 am - 05:30 pm
  • friday 08:15 am - 05:30 pm
  • Week End Closed
  • Emergency Unit Open Any Time

Contact Us


Singapore’s largest provider of electrical licensing services.
ON Engineers Pte Ltd

  • Address14 Gul Avenue, Singapore 629657
  • Phone+65 6795 4666
  • Mailgeneral@onengineers.com

ABOUT US


  is a merger of two well-regarded companies in the electrical licensing services sector – J.M. Pang & Seah (Pte) Ltd (“JMPS”) and Quality Power Management Pte Ltd (“QPM”), both owned by Pon Asia Holding Pte Ltd.

: 14 Gul Avenue, Singapore 629657
: +65 6795 4666
: +65 6795 4222
: general@onengineers.com

The use of multiple sensors …


Dissolved Gas Analysis Of Transformer Oil


News & Events


DATA CENTRE WORLD SINGAPORE 9-10 OCT 2019, MBS

Oct 11, 2019

Dissolved Gas Analysis (DGA) of mineral oil used in transformers

May 22, 2009

The modern approach to maintaining your electrical assets

Mar 15, 2021

All Rights Reserved © 2019 - 2020 | Pte Ltd.

Terms & Conditions (Sales) | Terms & Conditions (Purchase) | Privacy Statement