The modern approach to maintaining your electrical assets
BYLEE WAI MENGELECTRICAL PE/LEW (230KV GRADE)
The cost of asset replacement – When is the best time to invest
BYLEE WAI MENGELECTRICAL PE/LEW (230KV GRADE)
Finding Fault in electrical installation
The articles are presented in 4 parts:- Part 1 talks about Partial Discharge and our experience with multiple fault...
Faults at cable termination
FAULTS AT CABLE TERMINATION Part 1 – The various layers of a screened type Power Cable Part 2 –...
Re-install front panel of GIS
Removal of front panel of GIS
Cable termination to GIS
Dissolved Gas Analysis Of Transformer Oil
Presented by Er. Lee Wai Meng (Managing Director of ON Engineers Pte Ltd), on July 2020
The use of multiple sensors, of electrical and non-electrical type, for online PD measurement of cables, transformers, switchgears and motors
Presented by Er. Lee Wai Meng (Managing Director of ON Engineers Pte Ltd), on 20th May 2020
At ITE College West HNITEC EE Apex Day – 22nd October 2019
ON Engineer’s Steven Leong was invited to share his experience at ITE College West Hnitec Electrical Engineering APEX (Achieving...