The modern approach to maintaining your electrical assets
BYLEE WAI MENGELECTRICAL PE/LEW (230KV GRADE)
The cost of asset replacement – When is the best time to invest
BYLEE WAI MENGELECTRICAL PE/LEW (230KV GRADE)
Finding Fault in electrical installation
The articles are presented in 4 parts:- Part 1 talks about Partial Discharge and our experience with multiple fault detection methods.Part 2 touches on Transformer faults.Part 3 touches on Cables and shares some key perspectives.Part 4 looks at Fault Current and provides useful calculation methods for the practicing engineer.
Faults at cable termination
FAULTS AT CABLE TERMINATION Part 1 – The various layers of a screened type Power Cable Part 2 – Heat shrink type cable termination Part 3 – Case studies Part 4 – Use of online Partial Discharge measurement to detect defects at cable termination. BYLEE WAI MENGELECTRICAL PE/LEW (230KV GRADE)
Re-install front panel of GIS
Removal of front panel of GIS
Cable termination to GIS
Dissolved Gas Analysis Of Transformer Oil
Presented by Er. Lee Wai Meng (Managing Director of ON Engineers Pte Ltd), on July 2020
The use of multiple sensors, of electrical and non-electrical type, for online PD measurement of cables, transformers, switchgears and motors
Presented by Er. Lee Wai Meng (Managing Director of ON Engineers Pte Ltd), on 20th May 2020
At ITE College West HNITEC EE Apex Day – 22nd October 2019
ON Engineer’s Steven Leong was invited to share his experience at ITE College West Hnitec Electrical Engineering APEX (Achieving Personal Excellence) Day, an event which recognises the achievements of the students. Steven shared his journey, from ITE to his attainment of LEW Licence and how new graduates can contribute to the electrical industry effectively. This […]